Fire-Rating Basics For Interior Wraps In UAE Fit-Outs: What Facility Managers Really Check

Fire-Rating Basics For Interior Wraps In UAE Fit-Outs: What Facility Managers Really Check

December 12, 2025 Off By Arkadiy Ermakov

In Dubai, fit-out is not just about decoration, furniture and beautiful ceilings. This is a complex system of steps, where each decision is linked to regulatory requirements and checks. The shell and core turns into a white framework, then into Category A, and only after that into Category B. Risks are growing at each level: suspended ceilings can block sprinklers, furniture can clutter escape routes, and partitions can trap smoke.

The Path From Idea To Handover

Image

The process begins with a site inspection, where the customer and contractor record the purpose of the future office, store or restaurant. Then concept design is born with layout proposals, mood boards and 3D models. But it’s a long way from a real construction site. Technical drawings, architectural diagrams, HVAC systems, MEP drawings, fire alarms, emergency exits all must be sent to DM and DCD. Only after receiving the NOC can you move on.

Execution and site mobilization take from 4 to 12 weeks. Partitions, flooring, fire-resistant walls, smoke curtains, alarm systems appear on the site. In parallel, building management and consultants conduct inspections. Snagging and rectification fix the slightest errors: from loose fittings to paint touch-ups. The final step is the completion certificate from DCD, without which the facility cannot be put into operation.

The Role Of Regulators

Image

Dubai Municipality verifies structural integrity and environmental compliance. Civil Defense monitors fire alarms, sprinklers, evacuation routes and conducts final inspections. DM NOC confirms compliance with building codes, DCD NOC confirms compliance with fire standards. Fit-out is impossible without these documents. DEWA connects electricity and water, Trakhees and DDA control the free zones. Each authority has its own rules, and an error in documentation can lead to delays.

Systems That Save Lives

Image

Smoke detectors detect smoke particles, heat detectors respond to rising temperatures, beam detectors are suitable for warehouses and halls, flame detectors are indispensable in kitchens. Sprinklers are triggered automatically, gas systems protect electronics, fire extinguishers require staff training. Passive fire protection includes fire doors that hold flames and smoke for up to 1 hour, fire dampers that block air ducts, and fire-resistant walls. All this should be integrated into the project even before finishing.

Deadlines And Real Numbers

Image

Design and approvals take 2-6 weeks. The fit-out work lasts 4-12 weeks. The final checks take 1-2 weeks. As a result, a standard commercial project is completed in 7-20 weeks. Any mistake in the documentation, non-compliance with DCD requirements, or incorrect installation of fire extinguishing systems can extend the deadline by months.

Why Fire Safety Solves Everything

Image

The priorities are simple: first fire safety, then aesthetics. If you design evacuation routes with illuminated signage from the very beginning, integrate sprinklers and fire alarms to the final ceilings, the chances of quick approvals increase. Even aesthetic details such as interior wrapping in Dubai finishes must be coordinated with fire-resistant standards to avoid non-compliance during inspections. Violations mean not only redesign, but also fines, project shutdown, and a threat to business.

Fit-out in Dubai is a strict sequence of steps, where every action is controlled by DM and DCD. Fire detection systems, suppression equipment and passive protection are not an addition, but an obligatory part. Only their competent implementation ensures handover and business launch without delay. The bottom line is simple: fire safety in fit-out projects is the foundation on which any operation is built.